Our projects / Sierra Leone

Sierra Leone

Waste-to-energy · Freetown, Sierra Leone

Late Stage Development

Project overview

Energy that creates
opportunity.

Infinitum Energy has set out to create a meaningful impact in the young and growing country of Sierra Leone by implementing a 1,000 ton per day, waste to energy facility. The facility will produce 30MW of clean, renewable baseload power, increasing the available power to the grid, operated by Electrical Distribution & Supply Authority, under the control of the Minister of Energy, by 40%.

The goal of the project will allow for the safe diversion of approximately 30% of the waste generated in the greater Western Area of Sierra Leone. The Western Area consists of the City of Freetown, the city of Waterloo and some other rural areas, with a combined population of approximately 2.2 million people.

30 MWPlanned power capacity
241M kWhExpected annual electricity
1,500+Projected local jobs
$190MPlanned investment
9MProjected carbon offset (tonnes)
$102MExpected taxes over the PPA term

Planned project outcomes from the published project particulars. Figures are projections, subject to development and financing.

From concept to operation

The path to
lasting impact.

4of 9
Milestones completeFrom the published project plan
Government milestoneInfinitum Energy milestone Completed
Select a checkpoint to explore
01–03 Establish04–06 Develop07–09 Deliver
MILESTONE 05 / 09
Infinitum Energy

Detailed Engineering: ESIA Grid Study FEED

Planned

Detailed engineering, including environmental and social impact assessment (ESIA), a grid study, and front-end engineering design (FEED).